How to Choose a Warehouse Automation System Manufacturer

Author: Cheryl

Nov. 24, 2026

1 0

How to Choose a Warehouse Automation System Manufacturer

Choose a warehouse automation system manufacturer by matching its engineering capabilities to your operational requirements—not by comparing equipment prices alone. Evaluate how well each supplier understands your inventory, throughput, building constraints, software environment, safety requirements, and plans for future growth. Then verify its design process, integration responsibilities, project support, documentation, and service arrangements before requesting a comparable quotation. For projects that combine automated equipment with storage infrastructure, include rack and shelving design in the same evaluation.

Read more

Key Takeaways

  • Define the warehouse problem and measurable operating requirements before contacting manufacturers.
  • Compare complete, clearly scoped solutions, including software, integration, installation, and support.
  • Check engineering capabilities, safety documentation, communication practices, and service coverage.
  • Ask how the proposed system will work with your racks, shelves, building, and existing processes.
  • Use a written checklist and consistent request for proposal to compare suppliers fairly.

Start with Your Warehouse Requirements

A manufacturer can only recommend a suitable system when it understands the work the warehouse must perform. Document the current process, the bottlenecks you want to address, and the operational changes you expect after implementation. Be specific about product dimensions, inventory profiles, order patterns, labor constraints, and available floor and vertical space. This initial information helps suppliers assess feasibility before they propose equipment.

Build a useful data brief

Share the information you already track, and identify estimates clearly rather than presenting them as confirmed figures. Useful inputs include the number of active SKUs, product dimensions and weights, order lines per hour, operating hours per day, seasonal peaks, and inventory growth expectations. Include a current building layout with column locations, clear height, floor conditions if known, fire protection constraints, and existing rack or shelving details. A data brief based on the most recent 12 months of order and inventory records can help reveal seasonal variation, if those records are available.

State what success means for your project. For example, you may be targeting a defined order throughput in lines per hour, fewer manual handling steps, improved storage density, or more reliable inventory tracking. Treat any target as a requirement to be validated through design rather than a guaranteed outcome. Ask the manufacturer to explain its assumptions and identify what operational or building conditions could affect the result.

Evaluate the Manufacturer’s Technical Fit

Warehouse automation covers a range of equipment and system designs, from conveyor and sortation solutions to automated storage and retrieval systems, goods-to-person workstations, and mobile robots. Not every manufacturer builds every technology, and some projects require coordination among equipment suppliers, software providers, and integrators. Ask which parts the manufacturer designs and produces, which parts it sources, and who is accountable for coordinating the complete project. A clear division of responsibility reduces gaps during installation and commissioning.

Assess engineering and storage-system integration

Review how the supplier converts operational data into a layout, equipment specification, and implementation plan. Ask whether its proposal accounts for aisle widths, picking and replenishment flows, access for maintenance, product handling needs, and future expansion. If you use racks or shelves, confirm that the proposed automation is compatible with their configuration and intended loading conditions. For example, provide aisle dimensions in millimeters and clear building height in meters so the design team can check spatial constraints using consistent units.

Request drawings and assumptions that are detailed enough for your technical team to review. Depending on the project, these may include a system layout, process flow, equipment list, interface requirements, and an outline of installation responsibilities. Ask how design changes are handled and which party reviews site conditions before equipment is finalized. A proposal that explains constraints is more useful than one that offers performance figures without showing how they were calculated.

Check Software, Integration, and Project Delivery

Automation depends on more than mechanical equipment. Clarify how the system will communicate with your warehouse management system, enterprise resource planning software, warehouse control system, or other operational tools. Ask about interface specifications, data ownership, testing responsibilities, and what happens if a software change is needed. If your internal IT team or a third-party integrator will participate, include them in technical discussions early.

Confirm scope from design through commissioning

Ask for a written description of the project stages, deliverables, customer responsibilities, and acceptance process. Confirm who manages site preparation, equipment installation, operator training, commissioning, and handover documentation. The proposal should state what is included and excluded, including travel, civil work, electrical work, network infrastructure, and any third-party software. Where delivery dates matter, request a project schedule with dependencies and milestones rather than relying on a single estimated completion date.

HEGERLS are exported all over the world and different industries with quality first. Our belief is to provide our customers with more and better high value-added products. Let's create a better future together.

Understand the manufacturer’s service model before purchase. Ask where technical support is available, what information is needed to raise a service request, and whether spare parts, maintenance guidance, and training are included or separately priced. Response times and service availability should be documented in the commercial agreement if they are important to your operation. Do not assume that support is local or available around the clock unless the supplier confirms it in writing.

Compare Quality, Safety, and Supplier Reliability

Evaluate the supplier’s quality controls and safety approach against the requirements that apply to your site and project. Ask for relevant technical documentation, risk assessment information, equipment specifications, and details of inspection or testing procedures. Requirements vary by equipment type, installation location, and jurisdiction, so confirm applicable standards with your internal safety team and qualified local advisers. Avoid treating a general statement of compliance as a substitute for project-specific documentation.

Verify claims and references

Request references for projects with comparable workflows, operating conditions, or equipment scope, where the supplier can share them. Ask what the reference project included and whether it is relevant to your own requirements; a similar company name or industry alone does not prove technical fit. For performance claims, request the baseline, measurement method, operating assumptions, and acceptance criteria. If a claim cannot be tied to a defined scope and method, treat it as an estimate that needs clarification.

Also assess the supplier’s communication and decision-making process. Identify your main contact, technical escalation route, and the people responsible for commercial, engineering, software, and service questions. A manufacturer should be able to explain uncertainties and dependencies, not just present a polished proposal. Clear answers during evaluation are useful evidence of how project discussions may be handled later.

Compare Proposals on a Like-for-Like Basis

A lower initial price may exclude important components or services, so compare the full scope and expected ownership requirements. Build a comparison table that covers equipment, software, integration, site work, installation, commissioning, training, warranties, maintenance, and spare parts. Record exclusions, assumptions, optional items, and currency or tax treatment alongside each price. Ask suppliers to revise proposals when their scopes do not align.

Use a consistent supplier scorecard

Score each manufacturer against the same criteria, assigning greater importance to the factors that matter most for your facility. A practical scorecard can include process fit, engineering detail, software compatibility, safety documentation, project management, lifecycle support, commercial transparency, and relevant references. Keep supporting evidence next to each score so that the result reflects documented capabilities rather than presentation quality. Include operations, engineering, IT, procurement, and safety stakeholders in the review where relevant.

Do not choose a solution solely on projected labor savings, storage density, or throughput. Ask what baseline and assumptions support each projection, what costs are excluded, and how results will be measured after start-up. Consider how the system will respond to changes in product mix, order profiles, staffing, and operating schedules. A solution that is easier to adapt may be preferable to one that only fits a narrow forecast.

Common Selection Mistakes to Avoid

  • Starting with equipment rather than the process: Define the operational problem first, then compare technologies that may address it.
  • Providing incomplete data: Missing item dimensions, peak demand, or building constraints can undermine early design assumptions.
  • Overlooking interface ownership: Confirm who is responsible for software connections and end-to-end testing.
  • Comparing headline prices: Review exclusions and lifecycle services before judging commercial value.
  • Ignoring existing storage: Check compatibility between the automation concept and current racks, shelves, and material flows.
  • Accepting unqualified performance promises: Request assumptions, methods, and written acceptance criteria.

Questions to Ask Before Shortlisting a Manufacturer

  1. Which parts of the proposed system do you manufacture, engineer, integrate, or source from other suppliers?
  2. What operating and building data do you need to produce a reliable preliminary design?
  3. How will the system connect to our current warehouse and business software?
  4. What are the project boundaries, customer responsibilities, and key schedule dependencies?
  5. What documentation, training, commissioning, and after-sales support are included?
  6. How are performance assumptions and acceptance criteria defined and verified?

Conclusion: Choose a Partner That Can Support the Whole Project

The right warehouse automation system manufacturer is the supplier whose capabilities, project scope, and support model fit your documented operational needs. Start with reliable warehouse data, check technical and software compatibility, review safety and quality documentation, and compare complete proposals using the same criteria. Verify important claims and put responsibilities, acceptance conditions, and service expectations in writing before committing. These steps make supplier selection more transparent and help your team identify design risks early.

As a stacking racks and shelves supplier, HEGERLS can discuss how storage infrastructure fits into a warehouse project alongside automation requirements. Share your facility layout, product profile, operating targets, and project timeline to begin a practical review of the scope. Your team can then determine whether storage design, automation equipment, or coordinated supplier input is needed for the next stage.

Want more information on How to Choose a Warehouse Automation System Manufacturer? Feel free to contact us.